On a highly exposed site and with an industrial worksite in progress, Rio Tinto Aluminium (RTA) needs to guarantee the safety of its employees.
During the 4 years required to build a second water supply tunnel for the Kemano hydroelectric power station in British Columbia, MND ensures the continuity of the work by protecting the site and the teams. A site highly exposed to avalanches and extreme snow and weather conditions and the expressed need to be able to dismantle the systems at the end of the work to limit the footprint that MND responds with :