First ORIZONâ„¢ production unit | France First ORIZONâ„¢ production unit | 2024 8000 pphpd 7 m/s 20 p/v Discover the project
Thyon 2000 - Petit Vallon | Switzerland Surface Lift | 2023 SURFACE LIFT 480pph 308m 69m 1,8 m/s Discover the project
Hoedown Hill | United States Covered carpet | 2023 4 CARPETS 495m 0,8 m/s TAILOR MADE Discover the project
La Rosière - Dahu | France Fixed grip chairlift | 2023 CF4 2000 pph 491m 107m 2,3 m/s Discover the project
Waterville | United States Detachable chairlift | 2022 TSD6 3000. pph 100 1740m 483m 5m/s Discover the project
Tourette | France Detachable chairlift | 2022 TSD6 2800. pph 65 1290m 292m 5 m/s Discover the project
La Réunion | France JIG-BACK | 2020 AT60 1300 m 305 m 27km/h 2 x 50 pers 7,5M/an Discover the project
Chongli Changchengling ski resort | China Fixed-grip chairlift | 2018 CF4 1200 pph 56 860m 106m Discover the project
Blondin of the EDF hydroelectric site | France Transport of materials | 2015 TRANSPORT OF MATERIALS 1480m 620m 62% Discover the project
La Pierre Saint Martin | France Fixed-grip chairlift | 2017 CF4 2000 pph 1003m 262m 113 Discover the project
Montmartre Funicular | France Inclined elevator | 2018 ELEVATOR 60 pph 150kW 107 m 37 m Discover the project
Sochi Rosa Khutor | Russia Fixed-grip chairlift | 2014 CF4 1200 pph 67 1041m 355m Discover the project
Avoriaz - La Léchère | France Detachable chairlift | 2019 CD6 3000 pph 96 1804m 239m Discover the project
Val Thorens - Boismint | France Detachable chairlift | 2015 CD6 2600 pph 85 1835m 591m Discover the project
La Rosière - Mont Valaisan | France Detachable chairlift | 2018 CD6 2400 pph 43 876m 344m Discover the project
La Rosière - Moulins Express | France Detachable chairlift | 2018 CD6 2800 pph 82 1648 m 522 m Discover the project
Le Corbier - Mont Corbier | France Detachable chairlift | 2018 CD6 3000 pph 86 1754m 570m DIRECT DRIVE Discover the project
Vars | France Illuminated covered carpet | 2019 COVERED CARPET 3360 pph 0,7 m/s 143m Discover the project
Lotte Arai ski resort | Japan Illuminated covered carpet | 2017 COVERED CARPET ALUMINUM 0,7 m/s 152m Discover the project
Flaine Grand Massif | France Covered carpet | 2018 COVERED CARPET ALUMINUM 1,2 m/s 146m Discover the project
Courchevel | France Covered carpet | 2016 COVERED CARPET ALUMINUM 0,7 m/s 50m / 62m / 68m Discover the project