Huy | Belgium
Jig-back | 2021- AT60
- 1294 m
- 131 m
- 30km/h
- 2 x 15
- 785 000/year
The Huy jig-back benefits from a rigorous maintenance program to ensure its proper operation and user safety. A maintenance contract was signed in February, formalizing MND’s commitment, in partnership with STEM, to providing technical support for its operation.
From the moment the cable car opened, MND has provided remote technical support, ensuring optimal assistance for the operator. STEM, as a technical partner, oversees the maintenance carried out by the operator.
La maintenance annuelle du téléphérique s’étend sur trois semaines, période durant laquelle des In-depth inspections and technical tests are carried out:
STEM, present on-site, monitors the progress of maintenance operations and provides regular updates. MND will conduct the annual inspection at the end of March, ahead of the planned reopening in early April.
Additionally, a lighter semi-annual maintenance is performed at the end of each operating period. This focuses on technical adjustments and safety checks, primarily carried out through remote assistance.
Thanks to this structured partnership between MND, STEM, and the operator, the Huy cable car benefits from recognized technical expertise. This rigorous monitoring ensures passenger safety and the long-term reliability of the installation, maintaining high performance standards.