Blondin of the EDF hydroelectric site 01 / 03
Blondin of the EDF hydroelectric site 02 / 03
Blondin of the EDF hydroelectric site 03 / 03

Blondin of the EDF hydroelectric site | Francia

Transport of materials | 2015
Una soluzione affidabile e pratica per il trasporto di materiali nel sito idroelettrico di EDF
  • TRANSPORT OF MATERIALS
  • 1480m
  • 620m
  • 62%

Per il trasporto dei materiali, i sistemi di trasporto via cavo sono una soluzione particolarmente adatta e flessibile.

MND Ropeways
MND uses cookies on this site. With your consent, we will use them to measure and analyze site usage (analytic cookies), to tailor the site to your interests (personalization cookies) and to present you with relevant advertising and information (targeting cookies).