Blondin of the EDF hydroelectric site 01 / 03
Blondin of the EDF hydroelectric site 02 / 03
Blondin of the EDF hydroelectric site 03 / 03

Blondin of the EDF hydroelectric site | France

Transport of materials | 2015
A reliable and practical solution for transporting materials to EDF's hydroelectric site
  • TRANSPORT OF MATERIALS
  • 1480m
  • 620m
  • 62%

In order to transport materials, cable transport systems are a particularly suitable and flexible solution.

MND Ropeways